The damage you can see is the smallest part of the claim.

After hail, storm, lightning or fire, the visibly broken modules are counted within days. The real financial question takes EL imaging to answer: how many modules carry hidden cell damage that will surface as power loss over the next five years? Sinovoltaics mobilises rapid post-event campaigns that find the full extent, quantify the loss and document it to insurance-grade standard. 
[Report an event]

What damage assessment covers 

Post-event damage assessment for solar plants combines visual survey, IR thermography and EL imaging after hail, storm, lightning or fire - detecting both visible destruction and hidden cell damage, quantifying total loss and producing evidence packages for insurance claims.

Included: 

  • Rapid mobilisation - assessment scoped within days of the event, not weeks 
  • Full-plant screening - drone IR + visual survey localise the damage footprint 
  • EL sampling to 100% coverage of affected areas - hail damage is predominantly invisible: shattered cells behind intact glass 
  • Loss quantification - damaged-module counts, power-loss measurement, degradation prognosis for borderline modules 
  • Insurance-grade evidence package - per-module documentation, methodology statement, loss summary structured for adjusters 
  • Remediation verification - replacements and repairs inspected before the claim closes 


Deliverables: event assessment report, module disposition register (replace / monitor / sound), insurance evidence dossier, remediation sign-off.

Hail: the textbook hidden loss 

A hailstorm can crack cells across thousands of modules while breaking glass on a handful. Visually, the plant looks fine and may even perform normally for months - the cracks grow under thermal cycling, and the yield loss arrives in years two and three, long after the claim window closed.

EL imaging photographs the damage the day after the storm. The difference between “47 broken modules” and “47 broken plus 3,900 cell-damaged modules” is routinely the majority of the claim value. Where a pre-event baseline exists - factory EL, on-arrival records or annual campaigns - pre-existing damage is separated from event damage per serial number, which is precisely the dispute every adjuster raises.

When you need this 

  • Hail, storm, lightning, flood or fire has hit a plant 
  • The insurer’s adjuster counted visible damage only and you suspect more 
  • Pre-loss condition is disputed and you need origin evidence 
  • Borderline modules need a defensible replace-or-monitor ruling 
  • Framework cover: pre-agreed response terms across a fleet, before the next event 


Engagement model

Per-event assessment, or insurer/fleet framework agreements with pre-agreed mobilisation terms and pricing - the phone call you arrange before the storm season, not after the storm.

After the storm, before the cleanup: call. → Report an event 

Frequently asked questions

  • How fast can a team be on site? Scoping starts immediately on notification; field mobilisation is typically within days depending on site location and access. Evidence quality degrades as cleanup proceeds - call before the site is ‘tidied’.
  • Will the insurer accept EL evidence for cells that still produce power? Cell cracking is measurable physical damage with an established degradation pathway; EL is the industry-standard method of documenting it. Our dossiers pair imaging with power measurements and degradation prognosis - the format loss adjusters can process. 




  • Can you separate storm damage from pre-existing defects? With a baseline (factory, on-arrival or previous annual campaign), yes - per serial number. Without one, statistical damage-pattern analysis still supports origin argumentation. 
  • Do you also verify the repair? Yes - replacement modules are inspected (on-arrival logic) and remediation is verified before sign-off, so the claim closes on confirmed condition. 


Assuring solar PV and energy storage quality on-site in Asia-Pacific for over 10 years...

Since 2009, Sinovoltaics has audited over 350+ solar PV and battery energy storage factories across Asia-Pacific.

Our solar PV and battery energy storage component-specialized auditors are accredited with the International Register of Certificated Auditors (IRCA) and are proud to support you with a comprehensive and insightful assessment of prospective suppliers by using their extensive experience in the operations management of PV and BESS factories in Asia.

Headquartered in Hong Kong, and with offices in Shanghai, Switzerland, USA, and Vietnam and local quality inspection and audit teams in India, South Korea, Thailand, and Türkiye, we are strategically located close to all solar PV component and battery energy storage manufacturing bases and shipping ports in Asia and North America.

> About us